Test for 18 inch 75w floor fan
Recently, NAKKA had finished a large numbers of goods and had been inspected by a third party agency.
Inspection can fully check whether products meet customer requirements before shipment. It is necessary for third-party inspection companies to intervene, which can help buyers control some risks before delivery and reduce some unnecessary losses.
Third party inspection is generally divided into sample inspection, process inspection, final shipment inspection, container loading supervision, factory audit, factory inspection and other services, through the quantity of goods, packaging bar code, materials, printing information, product appearance, functional assembly, safety and other aspects of a comprehensive inspection.
Today we are going to introduce the inspection of product safety and product performance.
The test includes magnet test, burn test, Hi-pot test, earth continuity test, low voltage start check, power consumption test, lock motor test and and RPM test.
RPM and power consumption of 75w floor fan is as the following chart.
SPEED | RPM | POWER CONSUMPTION |
1 | 304 | 8W |
2 | 403 | 14W |
3 | 553 | 30W |
4 | 596 | 40W |
5 | 654 | 49W |
6 | 705 | 63W |